Tag Archives: Shale Shaker operation

Shale Shakers: Efficient Equipment for Drilling Operations

In modern drilling engineering, shale shakers have become an indispensable part of the solid control system. Shale shakers are mainly used for the solid-liquid separation in drilling fluids, removing cuttings and large solid particles through vibration screening, providing stable and clean mud conditions for subsequent solid control equipment, thereby ensuring the continuity and safety of drilling operations.

Shale Shakers: Efficient Equipment for Drilling Operations

Shale shaker is usually installed at the front end of the drilling fluid circulation system and is the first treatment equipment in the solid control process. Its main functions include:

  • separating drill cuttings and large solid particles from the drilling fluid;
  • reducing the solid content of the drilling fluid and improving rheological properties;
  • alleviating the processing load on desanders, desilters, and centrifuges;
  • reducing mud waste and improving the reuse rate of drilling fluid.

For these reasons, shale shakers are widely used in oil, natural gas, and geothermal drilling operations.

The shale shaker generates regular vibrations through a vibrating motor, causing the screen box to move the screen at high speed. When the drilling fluid enters the screen surface from the feed inlet, the liquid phase passes through the screen into the mud tank, while the solid phase is retained on the screen surface and discharged along the direction of vibration. Different screen sizes and vibration modes can be adapted to various well conditions and mud performance requirements.

In drilling operations, a stably operating shale shaker helps to:

  • increase drilling speed and reduce non-productive time,
  • control drilling fluid costs,
  • reduce equipment wear and maintenance frequency,  
  • improve cleanliness and environmental performance at the work site.

Therefore, choosing the right shale shaker has a direct impact on the overall efficiency of drilling.

Shale Shakers: Efficient Equipment for Drilling Operations

In actual drilling operations, when selecting a shale shaker, the focus should be on:

  • whether the processing capacity matches the on-site circulation volume;
  • the type of vibration (linear, elliptical, etc.);
  • screen specifications and compatibility;
  • equipment maintenance and spare parts availability.

Reasonable selection helps to fully leverage the efficiency advantages of the shale shaker in drilling operations.

As a mature solid control equipment supplier in China, TR Solid Control Equipment has long focused on the research and manufacturing of shale shakers and supporting solid control systems. TR shale shakers feature a stable structure, easy screen replacement, and strong adaptability, meeting the needs of mud handling under various drilling conditions, and have been applied in numerous domestic and international drilling projects.

In summary, shale shakers are not only the fundamental equipment of drilling solid control systems but also a crucial part in ensuring drilling efficiency and mud quality. Through scientific selection and standardized use, shale shakers can consistently provide stable and reliable separation during drilling operations. TR solid control equipment will continue to offer professional vibrating screens and comprehensive solid control solutions for the drilling industry.

Mud shale shaker operation

Preparation for mud shale shaker operation

Mud shale shaker operation
  • Wear labor protection supplies: Before operating the mud shale shaker, you must correctly wear labor protection supplies, such as gloves, masks, etc., to protect your own safety and avoid direct contact with mud.
  • Check the mud shale shaker status:
    1. Check whether the screen is normal to ensure that there is no damage, wear and other conditions. If abnormal, should be replaced in time.
    2. Check whether the motor is normal, pay attention to whether there is abnormal sound or overheating phenomenon. If there is a problem, it needs to be repaired in time.
    3. Check whether the various parts of the vibrating screen are loose, and tighten them in time if they are loose.
    4. Check whether the pipeline valve is opened or closed according to the process flow to ensure that the equipment is in the correct working condition.
    5. Observe and check the sealing condition of the mud shaker screen to ensure that there is no leakage.
  • Confirm the safety conditions: ensure that there is no one, no tools or foreign bodies on the mud shale shaker to prevent accidents Operation procedure

China Mud shale shaker operation

Mud shale shaker operation ready to start and stop

Start the device:

  • 1. Turn on the power switch of the drilling shale shaker and screen according to the set parameters.
  • 2. During the starting process, pay attention to the motor rotation direction is correct, should be consistent with the direction marked on the belt cover.

Feed and adjust:

  • 1. Evenly distribute the slurry sample to be tested on the shaker. o Adjust the vibration amplitude and frequency as needed to achieve the best screening results.
  • 2. Adjust the size of the outlet valve according to the solid phase content of the slurry during operation. If the mud is too thick, the water spray valve can be opened for dilution.
shale shaker operation

Monitoring and adjustment:

  • 1. During the screening process, the operation status of the mud shaker is continuously monitored to ensure the normal operation of the equipment.
  • 2. If abnormal sound, vibration instability, etc., should be stopped in time for maintenance Post-operation processing mud shale shaker

Operation final work Shutdown and cleaning:

  • 1. After the screening is complete, turn off the power switch.
  • 2. Clean the mud shaker and screen as necessary to prevent mud residue from affecting the next use. The screen surface can be washed with water to remove the viscosity and fine sand trapped on the screen surface.

Thanks for visiting our website. Please feel free to leave a message if you any questions.

Contact Us:TR Solids Control

Sales office:No.10 West of North 2nd Ring Road Xi’an City, Shaanxi Province.

Manufacture: No.2 Goods yard road Xianyang City, Shaanxi Province.

Tel:+86-29-86332919

Call:+86-18509252400

E-mail:sales@trsolidscontrol.com

Web:www.trsolidscontrol.com

www.solidscontrolequipment.com